Fiberglass/Mineral Wool:
Skin/eye irritation – Use gloves (nitrile), long sleeves, and safety goggles
Respiratory risks – NIOSH-approved N95/P2 respirators for dust control
Avoid sweeping dry debris – Use HEPA vacuum systems
Spray Foam Chemicals:
Isocyanates can cause asthma – Full-face respirators with organic vapor cartridges
Off-gassing risks – Allow proper curing (24-72 hrs) before occupancy
Natural Fibers (Sheep’s Wool, Cellulose):
Dust suppression – Mist application during installation
Mold prevention – Store in dry conditions before use
Respiratory Protection:
Disposable masks (dust) vs. powered air-purifying respirators (PAPRs) for spray foam
Skin Protection:
Tyvek suits for spray applications
Anti-static clothing for flammable insulation
Eye/Face Protection:
Safety goggles for particulates
Face shields for chemical splashes
Identify Hazards: Material MSDS review, job site inspection
Evaluate Exposure Routes: Inhalation, skin contact, ingestion
Control Measures: Hierarchy of elimination > substitution > engineering controls > PPE
Documentation: COSHH assessments (UK), OSHA compliance (US)
Scaffold Requirements:
Guardrails (top edge height: 950mm)
Toe boards (min. 150mm) to prevent tool drops
Ladder Protocols:
4:1 angle ratio (1m out for every 4m up)
Extend ≥1m above landing point
Permit System: Mandatory for spaces with:
Limited entry/exit
Poor ventilation (O₂ <19.5%)
Monitoring:
Gas detectors for CO₂/VOCs
Buddy system with harnesses
UK:
Construction (Design & Management) Regulations 2015
Control of Substances Hazardous to Health (COSHH)
US:
OSHA 29 CFR 1926 (Construction Standards)
EPA Lead Renovation Rules for pre-1978 buildings
✔ Pre-job toolbox talks
✔ Emergency wash stations on-site
✔ Waste disposal per local regulations (e.g., fiberglass recycling)
✔ Regular equipment inspections (ladders, spray rigs)