Practical Applications & Case Studies

Lesson 7/8 | Study Time: 30 Min
Practical Applications & Case Studies

Module 7: Practical Applications & Case Studies

7.1 Hands-on Installation Exercises

Purpose: Develop real-world skills through structured practice in controlled environments.

Key Training Activities:

  • Wall Insulation Workshop

    • Practice installing cavity wall insulation using bead injection systems

    • Fit internal wall insulation boards with proper vapor barriers

    • Demonstrate external wall insulation (EWI) fixing techniques

  • Loft Insulation Challenge

    • Lay mineral wool to 270mm depth with proper ventilation gaps

    • Install rigid board insulation between rafters

    • Practice cutting and fitting around obstructions (tanks, wiring)

  • Floor Insulation Task

    • Fit PIR boards between suspended timber joists

    • Demonstrate underfloor insulation for solid concrete floors

  • Air Sealing Practical

    • Apply membrane taping at wall/ceiling junctions

    • Install airtightness grommets around service penetrations

Assessment Criteria:
✔ Correct material handling
✔ Precision in cutting/fitting
✔ Compliance with ventilation requirements


7.2 Common Mistakes & Troubleshooting

Identifying and rectifying frequent installation errors.

A) Thermal Bridging Issues:

  • Problem: Uninsulated lintels causing cold spots

  • Solution: Install insulated cavity closers

B) Moisture Problems:

  • Problem: Condensation after internal wall insulation

  • Diagnosis: Missing or incorrectly placed vapor barrier

  • Fix: Retrofit intelligent membranes (variable permeability)

C) Air Leakage Failures:

  • Problem: Failed airtightness test (≥7m³/h.m²)

  • Troubleshooting Steps:

    1. Smoke test to locate leaks

    2. Additional sealing at window reveals

    3. Membrane repairs at ceiling/wall junctions

D) Material Performance Issues:

  • Case: Sagging loft insulation after 6 months

  • Root Cause: Compression during installation

  • Prevention: Use netting to support materials


7.3 Real-World Case Studies

1. Residential Retrofit (1930s Semi-Detached)

  • Challenge: Upgrade EPC from E to B

  • Solutions Implemented:

    • External wall insulation (90mm PIR)

    • Mechanical ventilation with heat recovery (MVHR)

    • Air tightness improved to 3.5m³/h.m²

  • Results:

    • 62% reduction in heating costs

    • Eliminated condensation issues

2. Commercial Office Retrofit (2000s Building)

  • Challenge: Meet ESOS Phase 3 requirements

  • Key Interventions:

    • Flat roof insulation upgrade (120mm phenolic foam)

    • Thermal break installation at curtain walling connections

    • LED lighting + insulation package

  • Outcomes:

    • 38% energy use reduction

    • Achieved BREEAM Excellent rating

3. Social Housing Tower Block

  • Problem: High fuel poverty rates

  • Retrofit Approach:

    • Internal wall insulation (50mm insulated plasterboard)

    • Communal heating system upgrade

    • Window reveals insulated with aerogel

  • Impact:

    • Reduced tenant energy bills by £420/year

    • Eliminated mold complaints


Learning Outcomes

By completing this module, participants will:
✔ Demonstrate competent installation techniques
✔ Diagnose and resolve common insulation faults
✔ Apply best practices from real retrofit examples

Suggested Enhancement:

  • Virtual Reality (VR) simulations for complex detailing

  • Site visits to live retrofit projects