07345159778
support@getskillonline.com

Working with Others and Quality Standards

Lesson 5/5 | Study Time: 30 Min
Working with Others and Quality Standards

Module 5: Working with Others and Quality Standards

This final module prepares Brickwork Technicians – Level 2 for professional collaboration, adherence to procedures, and compliance with industry benchmarks to ensure high-quality, regulation-compliant construction work.


1. Team Communication and Roles On-Site

Key Principles for Effective Collaboration

  • Clear Communication Protocols:

    • Use briefings/toolbox talks to align teams on daily tasks.

    • Follow two-way radio/approved signals for noisy environments.

  • Defined Roles & Responsibilities:

    • Bricklayers: Setting out, building walls, checking quality.

    • Laborers: Mixing mortar, moving materials, cleaning.

    • Supervisors: Overseeing work, ensuring safety compliance.

  • Conflict Resolution:

    • Report issues via site hierarchy (foreman → project manager).

    • Document disagreements to prevent work stoppages.

Common Pitfalls:
❌ Assuming instructions are understood without confirmation.
❌ Poor coordination causing rework (e.g., misaligned walls).


2. Following Method Statements and Instructions

Interpreting Documentation

  • Method Statements:

    • Step-by-step guides for complex tasks (e.g., building retaining walls).

    • Include risk assessments, materials, and equipment lists.

  • Workplace Instructions:

    • Verbal/written directives from supervisors.

    • Clarify ambiguities before starting work.

Compliance Checklist:
✔ Verify latest drawing revisions.
✔ Sign off on permits (e.g., hot works, excavations).


3. Checking Work for Accuracy

Essential Quality Checks

  • Plumb (Vertical Alignment):

    • Use a spirit level or plumb bob – max tolerance ±3mm per 1m height.

  • Level (Horizontal Alignment):

    • Check with a straightedge – gaps ≤ 5mm over 3m.

  • Alignment (Straightness):

    • String lines for linear walls; laser levels for large areas.

Tools & Techniques:

  • Gauge Rod: Ensures consistent course heights.

  • Builder’s Square: Verifies 90° corners.

Corrective Actions:
⚠ Out-of-plumb walls: Adjust before mortar sets.
⚠ Uneven beds: Chip away excess mortar or repoint.


4. Industry Standards (NHBC, Building Regulations)

Key Compliance Requirements

  • NHBC Standards (UK):

    • Chapter 6.1 (Masonry): Cavity walls, wall ties, DPCs.

    • Chapter 7.1 (Foundations): Depth, width, material specs.

  • Building Regulations (Approved Documents):

    • Part A (Structure): Load-bearing stability.

    • Part C (Moisture): Damp-proofing requirements.

Documentation Examples:

  • Inspection records for sign-off at critical stages (e.g., DPC installation).

  • Material certifications (e.g., CE-marked bricks).


Conclusion

This module ensures technicians:
✓ Collaborate efficiently with teams and supervisors.
✓ Follow procedures to mitigate risks and errors.
✓ Maintain precision through rigorous checks.
✓ Meet legal standards to avoid costly rejections.

Need a sample method statement template or a quiz on NHBC standards?


Final Note: Mastery of these skills distinguishes competent tradespeople from amateurs, ensuring career progression and reputational excellence.