07345159778
support@getskillonline.com

Well Control (Intermediate Level)

Lesson 4/6 | Study Time: 30 Min
Well Control (Intermediate Level)

Module 4: Well Control (Intermediate Level) 


4.1 Kick Detection & Shut-In Procedures

Kick Detection:
A kick occurs when formation pressure exceeds mud pressure, allowing influx into the wellbore. Early detection is critical to prevent a blowout.

Warning Signs:

  • Pit Gain: Sudden increase in mud volume (primary indicator).

  • Flow Rate Changes: Unusual return flow when pumps are off.

  • Drilling Break: Rapid penetration rate (indicates softer, overpressured zone).

  • Gas Cut Mud: Reduced density due to gas entrainment.

Shut-In Procedures:

  • Soft Shut-In:

    • Slowly close choke while monitoring pressure to avoid water hammer effect.

    • Preferred for fragile formations or when risk of fracturing is high.

  • Hard Shut-In:

    • Immediate closure of BOP for rapid wellbore isolation.

    • Used when kick severity is high (e.g., fast-rising pit gain).

Key Action: Record SIDPP (Shut-In Drill Pipe Pressure) and SICP (Shut-In Casing Pressure) to calculate required kill mud weight.


4.2 BOP Stack & Equipment

The Blowout Preventer (BOP) Stack is the last line of defense against uncontrolled flow.

Components:

  1. Annular Preventer (e.g., Hydril):

    • Rubber packing element seals around any pipe size or open hole.

    • Operates via hydraulic pressure; can close partially to strip pipe.

  2. Ram BOPs:

    • Pipe Rams: Seal around specific drill pipe sizes.

    • Blind Rams: Close open hole (no pipe present).

    • Shear Rams: Cut drill pipe in emergencies.

  3. Choke Manifold:

    • Controls flow during well kill operations.

    • Adjusts backpressure to maintain constant bottomhole pressure (BHP).

API Standards for BOP Testing:

  • Pressure Testing: Weekly tests at rated working pressure (e.g., 5,000–15,000 psi).

  • Function Testing: Daily checks to ensure rams/annulars close within 30 seconds.

  • Certification: BOPs must meet API 53 (Well Control Equipment Systems).

4.3 Kill Methods


After shut-in, the well must be stabilized by circulating out the influx with heavier mud.

1. Driller’s Method:

  • First Circulation: Remove kick using original mud while maintaining constant casing pressure.

  • Second Circulation: Pump kill mud to well while monitoring drill pipe pressure.

  • Advantages: Simpler, faster for small kicks.

2. Wait-and-Weight (Engineer’s Method):

  • Single Circulation: Kill mud is prepared before pumping, balancing pressure throughout.

  • Advantages: Reduces casing pressure spikes; safer for high-pressure wells.

Comparison:

Aspect

Driller’s Method

Wait-and-Weight

Time

Faster (two circulations)

Slower (mud prep required)

Pressure Control

Higher casing pressure

Smoother pressure profile

Best For

Small kicks, shallow wells

Deep HPHT wells

Simulations & Case Studies:

  • Simulators: Train crews to respond to kicks using real-time pressure scenarios.

  • Case Study: Macondo Blowout (2010) – Highlighted BOP failure and kick response delays.

Key Takeaways:

  • Kick detection relies on pit gain, flow monitoring, and drilling breaks.

  • BOP stacks must comply with API standards; regular testing is mandatory.

  • Kill methods differ in speed and pressure control; selection depends on well conditions.

  • Training via simulations is critical for emergency preparedness.