Laser Grading: Ensures precise leveling (±5mm tolerance).
Slope Calculation:
Minimum 1:50 gradient for drainage.
Berms/swales used to direct water flow.
Proof Rolling: Final check for soft spots before paving.
Structural Inspection:
Cracks, uneven settlement, drainage function.
Utility Testing:
Water pressure, electrical continuity, gas leaks.
Snagging List:
Minor defects (e.g., backfill depressions, membrane tears).
Updated Plans: Reflects actual construction vs. original design.
Key Details:
Utility locations, foundation depths, material specs.
Digital Formats: CAD/BIM files for future maintenance.
Silt Fences: Filter runoff water.
Hydroseeding: Rapid grass growth to stabilize soil.
Sediment Basins: Collect debris before water exits site.
Recycled Materials: Crushed concrete for sub-base.
Low-Impact Techniques:
Permeable paving to reduce runoff.
Topsoil preservation for landscaping.
Carbon Reduction:
Electric machinery, local material sourcing.
This module ensures the site is properly compacted, documented, and environmentally compliant—ready for construction.