Final Preparation for Construction

Lesson 5/5 | Study Time: 30 Min
Final Preparation for Construction

Module 5: Final Preparation for Construction

1. Compaction and Grading

Machinery (Rollers, Compactors)

Equipment

Use Case

Key Features

Vibratory Roller

Large open areas (roads, foundations)

Uses vibration for deep compaction

Plate Compactor

Tight spaces, trenches

Manual operation, high-frequency impact

Sheep’s Foot Roller

Clay soils

Protruding feet knead soil layers

Achieving Desired Levels and Slopes

  • Laser Grading: Ensures precise leveling (±5mm tolerance).

  • Slope Calculation:

    • Minimum 1:50 gradient for drainage.

    • Berms/swales used to direct water flow.

  • Proof Rolling: Final check for soft spots before paving.


2. Site Handover

Quality Checks and Snagging

  • Structural Inspection:

    • Cracks, uneven settlement, drainage function.

  • Utility Testing:

    • Water pressure, electrical continuity, gas leaks.

  • Snagging List:

    • Minor defects (e.g., backfill depressions, membrane tears).

Documentation (As-Built Drawings)

  • Updated Plans: Reflects actual construction vs. original design.

  • Key Details:

    • Utility locations, foundation depths, material specs.

  • Digital Formats: CAD/BIM files for future maintenance.


3. Environmental Considerations

Erosion Control and Sediment Management

  • Silt Fences: Filter runoff water.

  • Hydroseeding: Rapid grass growth to stabilize soil.

  • Sediment Basins: Collect debris before water exits site.

Sustainable Groundwork Practices

  • Recycled Materials: Crushed concrete for sub-base.

  • Low-Impact Techniques:

    • Permeable paving to reduce runoff.

    • Topsoil preservation for landscaping.

  • Carbon Reduction:

    • Electric machinery, local material sourcing.


Conclusion

This module ensures the site is properly compacted, documented, and environmentally compliant—ready for construction.