07345159778
support@getskillonline.com

Troubleshooting & Repair

Lesson 4/5 | Study Time: 30 Min
Troubleshooting & Repair

Module 4: Troubleshooting & Repair


1. Common Failures & Causes

Understanding why mastic fails is critical for effective repairs and prevention.

  • Cracking:

    • Causes:

      • Excessive joint movement beyond the mastic’s elongation capacity.

      • Improper depth-to-width ratio (e.g., too thin of a bead).

      • UV degradation or aging of non-resistant mastics (e.g., acrylic).

    • Solution: Replace with a higher-grade, flexible sealant (e.g., silicone or polyurethane).

  • Delamination (Loss of Adhesion):

    • Causes:

      • Poor surface preparation (contaminants, dust, or moisture).

      • Incompatible primer or substrate (e.g., applying silicone over uncured polyurethane).

      • Thermal or structural movement breaking the bond.

    • Solution: Re-clean and prime the substrate before reapplication.

  • Discoloration:

    • Causes:

      • UV exposure breaking down pigments (common in acrylics).

      • Mold/mildew growth in humid environments.

      • Chemical reactions (e.g., some silicones turn yellow over time).

    • Solution: Use UV-stable or mold-resistant formulations; clean regularly.

2. Diagnostic Methods


Before repairing, assess the extent and cause of failure.

  • Peel Tests:

    • Gently pull the mastic from the substrate; cohesive failure (tearing within the mastic) vs. adhesive failure (separation from the substrate) indicates different issues.

  • Adhesion Tests:

    • Cross-Cut Test: Score a grid pattern into the mastic; poor adhesion is evident if sections flake off.

    • Tape Test (ASTM D3359): Apply and remove tape to check for sealant lift-off.

  • Moisture Meters:

    • Detect hidden moisture in substrates (critical before reapplying mastic to prevent future delamination).

3. Advanced Repair Protocols


Not all failures require full removal—strategic repairs can save time and material.

  • Partial Removal:

    • When to Use: Small cracks or localized delamination.

    • Technique:

      • Cut out the damaged section with a utility knife.

      • Clean and prime the exposed area.

      • Fill with fresh mastic, feathering edges for seamless blending.

  • Full Removal:

    • When to Use: Widespread failure or incompatible old mastic.

    • Technique:

      • Use a heat gun or chemical stripper to soften the mastic.

      • Scrape with a putty knife or oscillating tool (avoid substrate damage).

      • Sand/clean the joint before reapplication.

  • Splicing Techniques:

    • For long joints, stagger removal sections to maintain temporary weather resistance.

    • Overlap new mastic over old by 1–2" to ensure continuity.

Key Takeaway: Effective troubleshooting combines forensic analysis (identifying root causes) with surgical repairs to restore performance without unnecessary demolition.