Practical Assessments

Lesson 9/10 | Study Time: 30 Min
Practical Assessments

9. Practical Assessments

Hands-On Workshops


These structured training sessions allow learners to develop core dry-lining skills under supervision.

1. Fixing Plasterboard
Wall Application – Practice dot & dab and screw-fixing methods on mock walls
Ceiling Fixing – Install boards on suspended metal framing systems
Precision Cutting – Create openings for sockets, pipes and light fittings
Common Errors – Identify and correct board over-tightening, poor alignment

Assessment Criteria:
✓ Correct adhesive application (dot size/spacing for dab method)
✓ Accurate screw spacing (150mm edges/300mm field)
✓ Clean board cuts with minimal waste

2. Jointing and Finishing
Taping Techniques – Embed scrim tape in wet compound
3-Coat Application – Master progressive feathering of joint compound
Corner Beading – Install and finish both internal and external angles

Workshop Progression:

  1. Straight butt joints → Tapered edge joints → Complex corner work

  2. Small patches → Full wall finishing

Simulated Project Work


A comprehensive assessment where learners construct a complete partition from frame to finish.

Partition Wall Build:

  1. Planning Phase

    • Interpret technical drawings

    • Calculate materials (studs, boards, screws)

    • Conduct risk assessment

  2. Framing Construction

    • Assemble metal stud framework

    • Install noggins for stability

    • Verify plumb and square

  3. Board Installation

    • Fix boards to both sides with staggered joints

    • Create service openings

    • Apply fire sealant where required

  4. Finishing Process

    • Tape all joints

    • Apply finishing coats

    • Install corner protection

Assessment Matrix:

Skill

Competency Standard

Pass Criteria

Framework Construction

Studs spaced ≤600mm, perfectly plumb

≤2mm deviation over 2.4m height

Board Fixing

Screws flush without breaking paper

0 visible screw defects per 1m²

Joint Finishing

Imperceptible transitions between boards

No visible ridges under raking light

Time Management

Completion within allocated project timeline

All stages signed off within deadline

Safety Integration:
✔ Continuous PPE compliance monitoring
✔ Tool safety demonstrations (screw gun depth settings)
✔ Manual handling technique assessments

Final Evaluation:

  • Instructor Review – Direct feedback on technique

  • Peer Assessment – Collaborative quality checking

  • Photographic Evidence – Portfolio documentation

Progression Pathway:
Successful candidates advance to:
→ Complex curved wall installations
→ Suspended ceiling systems
→ Fire-rated partition construction