07345159778
support@getskillonline.com

Site Supervision and Management

Lesson 4/8 | Study Time: 30 Min
Site Supervision and Management

Module 4: Site Supervision and Management 

This module prepares bricklayers for leadership roles in construction, covering technical planning, team coordination, and compliance to ensure projects meet deadlines, budgets, and regulatory standards.


4.1 Reading Advanced Construction Drawings

Supervisors must interpret complex architectural and structural drawings to guide teams accurately.

Key Drawing Types

  • Elevations & Sections: Show brickwork details (e.g., arches, corbelling).

  • Foundation Plans: Indicate load-bearing walls and footing depths.

  • Detail Drawings: Highlight junctions (e.g., window lintels, DPC positions).

Critical Symbols & Annotations

  • Brick Bond Patterns: Notated with hatch marks (e.g., diagonal for Flemish bond).

  • Material Specifications: Labels like "Class B Engineering Brick" or "NHL 3.5 Mortar."

  • Tolerance Markings: E.g., "±5mm vertical alignment over 3m."

Skill Drill: Practice converting 2D drawings into 3D mental models to foresee construction challenges.


4.2 Planning Work for Teams and Managing Resources

Effective resource allocation prevents delays and cost overruns.

Planning Tools

  • Gantt Charts: Schedule bricklaying phases (e.g., foundations → walls → finishes).

  • Material Takeoffs: Calculate bricks/mortar from drawings (add 10% waste allowance).

Team Management

  • Task Delegation: Assign roles (e.g., mixer operator, line layers, finishers).

  • Just-in-Time Delivery: Coordinate material shipments to avoid site clutter.

Pro Tip: Use daily briefings to align teams with changing priorities (e.g., weather delays).


4.3 Health & Safety Leadership (Risk Assessments, Method Statements)

Supervisors enforce CDM 2015 regulations to protect workers.

Risk Mitigation

  • Scaffold Checks: Must comply with TG20:21 standards; inspect before each shift.

  • Silica Dust Control: Water suppression + PPE (FFP3 masks) when cutting bricks.

  • Manual Handling: Limit brick stacks to <1m height; use mechanical aids.

Documentation

  • Method Statements: Step-by-step safe workflows (e.g., "Lintel Installation SOP").

  • Toolbox Talks: 10-minute safety refreshers (e.g., ladder angles, hot weather hydration).

Stat Alert: Failure to comply can lead to HSE fines (£20K+ per violation).


4.4 Quality Control and Compliance with Standards (NHBC, CIOB)

Ensuring work meets industry benchmarks avoids rework and legal disputes.

Inspection Protocols

  • Checkpoints:

    • Perpend Alignment: Max 3mm deviation over 5m.

    • Mortar Joints: Consistent 10mm (±1mm) with full bedding.

  • Testing:

    • Mortar Cube Tests: Verify compressive strength (e.g., M4 = 4N/mm²).

Standards to Follow

  • NHBC: Requires cavity trays and weep holes in residential builds.

  • CIOB Code of Practice: Covers ethics and project handover procedures.

Defect Case Study: A failed damp-proof course install led to £15K repairs—highlighting QC importance.


Why This Module Matters

  • Career Progression: Supervisors earn 20–30% more than tradespeople.

  • Project Success: Poor planning causes 60% of construction delays (McKinsey).

  • Legal Shield: Documentation proves due diligence in disputes.

Practical Task:

  • Lead a mock site induction, covering hazards and emergency procedures.